Evaluasi Hidrolika Lumpur Pemboran Pada Trayek 17-1/2" Sumur 1-l Lapangan Aom


Oleh : Anugrah O'niel Manalu

Info Katalog

Nomor Panggil : 1165/TP/2019

Penerbit : FTKE - Usakti

Kota Terbit : Jakarta

Tahun Terbit : 2019

Pembimbing 1 : Abdul Hamid

Pembimbing 2 : Harin Widayatni

Subyek : Petroleum engineering - Well drilling

Kata Kunci : BHI, BHHP, JV, cutting transport ratio, Ca, PBI


File Repositori
No. Nama File Ukuran (KB) Status
1. 2019_TA_TM_071001500021_Halaman-Judul.pdf 9206.93
2. 2019_TA_TM_071001500021_BAB-1.pdf 1407.3
3. 2019_TA_TM_071001500021_BAB-2.pdf 9157.66
4. 2019_TA_TM_071001500021_BAB-3.pdf 1436.45
5. 2019_TA_TM_071001500021_BAB-4.pdf 2610.28
6. 2019_TA_TM_071001500021_BAB-5.pdf 930.39
7. 2019_TA_TM_071001500021_Daftar-Pustaka.pdf 1133.83
8. 2019_TA_TM_071001500021_Lampiran.pdf 9239.41

H Hidrolika dalam pengeboran merupakan salah satu faktor penting dalamkeberhasilan pengeboran. Dengan perencanaan yang baik dan sistematis dapatmempercepat operasi pengeboran dengan memaksimalkan rate penetrasi sehinggamenekan biaya operasi. Salah satu fungsi dari sistem hidrolika lumpur yang utamaadalah menaikan serpihan bor dari annulus hingga ke permukaan. Apabilaserpihan bor tidak terangkat dengan sempurna, maka akan menyebabkan banyakpermasalahan seperti pipa terjepit, tersangkutnya serpihan bor pada pahat sertaturunnya rate penetrasi.Hidrolika pemboran pada trayek 17-1/2 sumur 1-L memiliki daya BHHPsebesar 444,567 HP. Yang hanya setara 22,048 % tekanan yang diberikan daripompa hingga ke mata bor. Sehingga bisa dilakukan optimasi, karena masihbelum memenuhi syarat optimum yaitu sebesar 65%.Parameter keberhasilan pengangkatan serpihan bor ke permukaan yaitudengan menghitung Cutting Transport Ratio > 90%. Selain itu menghitungCutting Concentration < 5% dan menghitung Particle Bed Index >1. Untukpengangkatan serbuk bor, apabila dilakukan optimasi maka perlu dihitung nilaidari sebelum dioptimasi dan setelah dioptimasi. Karena ROP dan laju alir fluidapemboran pasti berubah. Agar dapat dipertimbangkan kembali untukditerapkannya optimasi yang sudah dapat.

H Hydraulics in drilling is one of the important factors in the success of drilling.With good and systematic planning can accelerate drilling operations bymaximizing penetration rates so as to reduce operating costs. One of the mainfunctions of the mud hydraulics system is to raise drill bits from the annulus to thesurface. If the drill bits are not lifted perfectly, it will cause many problems suchas a pinched pipe, the entrapment of the drill bits and the penetration rate.Drilling hydraulics on routes 17-1 / 2 1-L wells have BHHP power of444,567 HP. Which is only equivalent to 22.048% of the pressure given from thepump to the drill bit. So that optimization can be done, because it still does notmeet the optimum requirements of 65%.The parameter of the success of removing the drill bits to the surface is bycalculating Cutting Transport Ratio> 90%. In addition, calculate CuttingConcentration <5% and calculate the Particle Bed Index> 1. For drill cuttings, ifit is optimized it is necessary to calculate the value from before being optimizedand after being optimized. Because ROP and drilling fluid flow rates must change.In order to be reconsidered for the implementation of the optimization that hasbeen obtained.