Perencanaan material untuk produk polycellonium strip esepuluh di PT. Avesta Continental Pack
Penerbit : FTI - Usakti
Kota Terbit : Jakarta
Tahun Terbit : 2003
Pembimbing 1 : Hamzah Yunuzir
Pembimbing 2 : Johnson Saragih
Subyek : Materials handling;Industrial management;Production control
Kata Kunci : material planning, polycellonium strip etentuan product, PT. Avesta Continental Pack
Status Posting : Published
Status : Tidak Lengkap
| No. | Nama File | Hal. | Link |
|---|---|---|---|
| 1. | 2003_TA_STI_06399324_Halaman-Judul.pdf | ||
| 2. | 2003_TA_STI_06399324_Lembar-Pengesahan.pdf | ||
| 3. | 2003_TA_STI_06399324_Bab-1_Pendahuluan.pdf | ||
| 4. | 2003_TA_STI_06399324_Bab-2_Landasan-Teori.pdf |
|
|
| 5. | 2003_TA_STI_06399324_Bab-3_Metodologi-Penelitian.pdf |
|
|
| 6. | 2003_TA_STI_06399324_Bab-4_Pengumpulan-dan-Pengolahan-Data.pdf |
|
|
| 7. | 2003_TA_STI_06399324_Bab-5_Analisa-Hasil-Pengolahan-Data.pdf |
|
|
| 8. | 2003_TA_STI_06399324_Bab-6_Kesimpulan-dan-Saran.pdf | ||
| 9. | 2003_TA_STI_06399324_Daftar-Pustaka.pdf | ||
| 10. | 2003_TA_STI_06399324_Lampiran.pdf |
|
P PT. Avesta Continental Pack adalah salah satu perusahaan yang bergerak dalam usaha pengemasan (packing). Perusahaan ini memproduksi produk kemasan fleksibel yang dilapisi alumunium foil, dan plastik film, serta produk gulungan alumunium foil yang sudah dilapisi dan kemasan pouch, yang digunakan dalam industri farmasi, industri makanan, kosmetik, dan alat-alat rumah tangga. Sampai saat ini dalam kelangsungan usahanya PT. Avesta Continental Pack masih menggunakan sistem persediaan untuk materialnya, karena pembelian material dilakukan berdasarkan hasil peramalan dan data historis. Untuk itu dilakukan perhitungan untuk menentukan periode pemesanan dan jumlah material untuk produk Polycellonium Strip ESEPULUH yang perlu dibeli dengan menggunakan Material Requirement Planning metode Lot for Lot, Least Unit Cost, Least Total cost, Part Period Balancing dan Period Order Quantity. Dari hasil perhitungan diperoleh bahwa: 1. Film MST 710 menggunakan metode Least Unit Cost, Least Total Cost, Part Period Balancing, atau Period Order Quantity, total biaya Rp. 182.396.700,-. 2. Tinta Putih menggunakan metode Least Unit Cost, total biaya Rp. 7.758.800,-. 3. Tinta Hijau menggunakan metode Least Unit Cost, total biaya Rp. 2.494.308,75. 4. Aluminium 12 p. 700 menggunakan metode Least Unit Cost, Least Total Cost, Part Period Balancing, atau Period Order Quantity, total biaya Rp. 135.007.800,-. 5. PE 15p menggunakan metode Least Unit Cost, Least Total Cost, Part Period Balancing, atau Period Order, total biaya Rp. 11.817.580,5. 6. EAA 301i menggunakan metode Lot for Lot, Least Unit Cost, Least Total Cost, atau Part Period Balancing, total biaya Rp. 53.505.588 -. (0
P PT. Avesta Continental Pack is a company engaged in the packaging business. This company produces flexible packaging products coated with aluminum foil and plastic film, as well as coated aluminum foil roll products and pouch packaging, which are used in the pharmaceutical, food, cosmetics, and household appliances industries. Until now, in its business continuity, PT. Avesta Continental Pack still uses an inventory system for its materials, because material purchases are made based on forecasting results and historical data. For this reason, calculations are carried out to determine the ordering period and the amount of material for the Polycellonium Strip ESEPULUH product that needs to be purchased using the Material Requirement Planning method Lot for Lot, Least Unit Cost, Least Total cost, Part Period Balancing and Period Order Quantity. From the calculation results, it is obtained that: 1. MST 710 Film uses the Least Unit Cost, Least Total Cost, Part Period Balancing, or Period Order Quantity method, the total cost is Rp. 182,396,700,-. 2. White Ink uses the Least Unit Cost method, the total cost is Rp. 7,758,800,-. 3. Green Ink using the Least Unit Cost method, the total cost is Rp. 2,494,308.75. 4. Aluminum 12 p. 700 using the Least Unit Cost, Least Total Cost, Part Period Balancing, or Period Order Quantity method, the total cost is Rp. 135,007,800,-. 5. PE 15p using the Least Unit Cost, Least Total Cost, Part Period Balancing, or Period Order method, the total cost is Rp. 11,817,580.5. 6. EAA 301i using the Lot for Lot, Least Unit Cost, Least Total Cost, or Part Period Balancing method, the total cost is Rp. 53,505,588 -. (0